The tool is in place, but people still use their spreadsheet
The project was declared finished when the system was installed. There was a training day and a manual. Weeks later, the team records the minimum in the new tool and keeps working in the same old spreadsheet, which they know and control. The reports come from there. The system becomes one more step.
It is easy to read it as resistance to change. It is usually something else: the tool does not solve something the spreadsheet did solve, no one knows whom to ask when something fails, or the training explained the buttons but not the new work. Adoption does not happen on its own at the end. It is designed as part of the project, with the same care as the tool.
If the spreadsheet is still alive, it is solving something the new system does not. Find out what it is.
Why ready technology goes unused
Behind low adoption there are usually concrete causes that can be identified by asking the people who should be using the tool.
The new flow costs more
If recording in the system takes more steps than the spreadsheet, with no visible benefit for the person recording, people go back to what they know.
There is no one to turn to
When something fails and it is not clear who handles it, the person solves it on their own, almost always outside the tool.
The training was generic
One single session for all roles leaves each person not knowing how to do their part of the work.
The knowledge was never written down
The answers live in the head of the person who implemented it. When that person leaves, questions have nowhere to be resolved.
None of these causes is fixed with another training day like the first one. Each calls for a different response: simplifying a step in the flow, naming who handles questions, separating training by role, or writing down what today only one person knows. That is why it is worth asking before deciding what to do.
Four pieces that are part of the project
Designing adoption means planning from the start how people will work with the tool and what support they will have. There are four pieces, and each one leaves a concrete deliverable.
The service
Who handles what, through which channel and how quickly they respond. A clear service model keeps each question from becoming a lost email.
Training by role
Whoever records, whoever approves and whoever consults need to learn different things. A role-based training plan teaches the work, not just the screen.
The knowledge base
Answers to real questions, written in the language of the person asking and updated with what emerges in use.
The initial support
The first weeks are decisive. Someone close to the team, resolving questions in the moment, prevents the shortcut of going back to the old way from taking hold.
None of these pieces is a closing step. They are planned together with the tool, tested with real users before going live, and adjusted based on what the first weeks show.
How to measure whether adoption is progressing
The most useful measure is coverage: what part of the defined scope already runs on the solution. It is measured against a known inventory of processes, areas or people, and relies on the system’s usage records. Without that inventory, there is no way to know how much is left.
What part of the scope is already running in the system?
Count the processes or areas that work in the tool versus those that should, according to the agreed inventory.
Is it used for the full job or just to comply?
A minimal record at the end of the day is not adoption. Check whether the work happens in the system or is only copied there.
Are the parallel files still in use?
Ask directly whether there are spreadsheets or folders that repeat what the system does, and what they are used for.
Take this measurement before going live and repeat it at agreed periods. The comparison shows where support is lacking and for which role training did not reach.
What to bring to the meeting
If you have an underused tool, bring two things to the meeting. The first, a short conversation with three people in different roles who should be using it: what they still do outside it and why. The second, the inventory of what should run in the system, to measure real coverage.
If the project has not started yet, ask that the plan include the service model, role-based training, the knowledge base and initial support, with an owner and a date, just like any other deliverable.
And before closing the project, agree that closing does not depend only on the system working, but on coverage reaching what was defined at the start. That way adoption stops being a hope and becomes a verifiable condition.
To bring to the meeting
What is worth having resolved before the next meeting.
0 of 5
Mark what you have already resolved.
NoteGeneral guide. Each organization should adapt it to its context.